A4 landscape brochure page 24,… - 图片创意预览

A4 landscape brochure page 24,…

A4 landscape brochure page 24, clean minimalist design, white background. Product specification tabl

用户头像

wakaka0804

2026.08.18
[商品] 使用【图2】中的ML/MP10/TPX/APX四款产品渲染图和完整参数;保留产品外观和参数信息。 [画面] A4竖版产品参数页(左页,与第3页跨页对开设计)。整体风格统一有设计感。顶部通栏:左侧蓝色竖线+大标题"Product Range",右侧小字"SERIES 01 · Counterbalance & Pallet",顶部一条细蓝线贯穿。上半部分:4款产品以卡片式横向排列(与右页产品系列形成连贯视觉),每张卡片含产品渲染图+型号名+1个核心图标,卡片之间用细蓝线或留白分隔。下半部分:完整参数表格(4列×10行),表头深蓝(#009cde)底白字,内容行交替白/极浅蓝,第一列参数名加粗,表格圆角,左侧有蓝色竖线装饰。页面右侧边缘有一条淡蓝色竖条(暗示与右页连接),底部页码"02"+细蓝线。整体精致、专业、有设计细节,与右页视觉呼应。 [视觉] 跨页对开左页:风格=高端工业科技风,精致有设计感;标题字=现代几何无衬线粗体;正文字=简洁无衬线体;主色=炭黑+#009cde青蓝;背景延展=纯白+顶部极淡蓝渐变;强调色=#009cde,用于表头、竖线、图标、页码、卡片标签;标题色=深炭黑;正文色=深灰;组件=蓝色竖线、圆角表格、交替行底色、产品卡片、细线分隔;光影=平面柔光,产品淡投影。 [文字] 顶部:蓝色竖线+"Product Range"大标题,右"SERIES 01"灰字;4款产品卡片:ML / MP10 / TPX / APX(每张卡片产品图+型号+小图标);表格参数行:Model / Load Capacity / Dimensions (L×W×H) / Lifting Height / Turning Radius / Aisle Width / Travel Speed / Battery Life / Navigation / Safety Obstacle Avoidance;底部页码"02"右对齐。 [规格] A4竖版,4K,避免表格字过小、颜色杂乱。[商品] 使用【图2】中的ML/MP10/TPX/APX四款产品渲染图和完整参数;保留产品外观和参数信息。
[画面] A4竖版产品参数页(左页,与第3页跨页对开设计)。整体风格统一有设计感。顶部通栏:左侧蓝色竖线+大标题"Product Range",右侧小字"SERIES 01 · Counterbalance & Pallet",顶部一条细蓝线贯穿。上半部分:4款产品以卡片式横向排列(与右页产品系列形成连贯视觉),每张卡片含产品渲染图+型号名+1个核心图标,卡片之间用细蓝线或留白分隔。下半部分:完整参数表格(4列×10行),表头深蓝(#009cde)底白字,内容行交替白/极浅蓝,第一列参数名加粗,表格圆角,左侧有蓝色竖线装饰。页面右侧边缘有一条淡蓝色竖条(暗示与右页连接),底部页码"02"+细蓝线。整体精致、专业、有设计细节,与右页视觉呼应。
[视觉] 跨页对开左页:风格=高端工业科技风,精致有设计感;标题字=现代几何无衬线粗体;正文字=简洁无衬线体;主色=炭黑+#009cde青蓝;背景延展=纯白+顶部极淡蓝渐变;强调色=#009cde,用于表头、竖线、图标、页码、卡片标签;标题色=深炭黑;正文色=深灰;组件=蓝色竖线、圆角表格、交替行底色、产品卡片、细线分隔;光影=平面柔光,产品淡投影。
[文字] 顶部:蓝色竖线+"Product Range"大标题,右"SERIES 01"灰字;4款产品卡片:ML / MP10 / TPX / APX(每张卡片产品图+型号+小图标);表格参数行:Model / Load Capacity / Dimensions (L×W×H) / Lifting Height / Turning Radius / Aisle Width / Travel Speed / Battery Life / Navigation / Safety Obstacle Avoidance;底部页码"02"右对齐。
[规格] A4竖版,4K,避免表格字过小、颜色杂乱。
[商品] 使用【图2】下方的AR/ARV/AU/AVK四款高位叉车产品渲染图和参数;保留产品外观和参数信息。 [画面] A4竖版产品参数页(右页,与第2页跨页对开设计,视觉连贯统一)。顶部通栏与左页呼应:左侧蓝色竖线+大标题,右侧小字"SERIES 02 · Reach & High-Stack",顶部细蓝线贯穿(与左页连成一线)。上半部分:4款产品卡片横向排列(与左页同款卡片样式,形成跨页产品矩阵),每张卡片产品图+型号+小图标。下半部分:完整参数表格(4列×10行),同款圆角表格样式,表头深蓝底白字,交替行底色。页面左侧边缘有淡蓝色竖条(与左页呼应)。底部页码"03"+细蓝线(与左页连成一线)。整体与左页形成完整跨页对开效果。 [视觉] 跨页对开右页:风格=高端工业科技风,精致有设计感(与左页完全统一);标题字=现代几何无衬线粗体;正文字=简洁无衬线体;主色=炭黑+#009cde青蓝;背景延展=纯白+顶部极淡蓝渐变;强调色=#009cde,用于表头、竖线、图标、页码、卡片标签;标题色=深炭黑;正文色=深灰;组件=蓝色竖线、圆角表格、交替行底色、产品卡片、细线分隔(与左页组件完全一致);光影=平面柔光,产品淡投影。 [文字] 顶部:蓝色竖线+"Product Range"大标题(与左页统一),右"SERIES 02"灰字;4款产品卡片:AR / ARV / AU / AVK(与左页同款卡片设计);表格参数行:Model / Load Capacity / Dimensions (L×W×H) / Lifting Height / Turning Radius / Aisle Width / Travel Speed / Battery Life / Navigation / Safety Obstacle Avoidance;底部页码"03"右对齐。 [规格] A4竖版,4K,避免表格字过小、颜色杂乱。[商品] 使用【图2】下方的AR/ARV/AU/AVK四款高位叉车产品渲染图和参数;保留产品外观和参数信息。
[画面] A4竖版产品参数页(右页,与第2页跨页对开设计,视觉连贯统一)。顶部通栏与左页呼应:左侧蓝色竖线+大标题,右侧小字"SERIES 02 · Reach & High-Stack",顶部细蓝线贯穿(与左页连成一线)。上半部分:4款产品卡片横向排列(与左页同款卡片样式,形成跨页产品矩阵),每张卡片产品图+型号+小图标。下半部分:完整参数表格(4列×10行),同款圆角表格样式,表头深蓝底白字,交替行底色。页面左侧边缘有淡蓝色竖条(与左页呼应)。底部页码"03"+细蓝线(与左页连成一线)。整体与左页形成完整跨页对开效果。
[视觉] 跨页对开右页:风格=高端工业科技风,精致有设计感(与左页完全统一);标题字=现代几何无衬线粗体;正文字=简洁无衬线体;主色=炭黑+#009cde青蓝;背景延展=纯白+顶部极淡蓝渐变;强调色=#009cde,用于表头、竖线、图标、页码、卡片标签;标题色=深炭黑;正文色=深灰;组件=蓝色竖线、圆角表格、交替行底色、产品卡片、细线分隔(与左页组件完全一致);光影=平面柔光,产品淡投影。
[文字] 顶部:蓝色竖线+"Product Range"大标题(与左页统一),右"SERIES 02"灰字;4款产品卡片:AR / ARV / AU / AVK(与左页同款卡片设计);表格参数行:Model / Load Capacity / Dimensions (L×W×H) / Lifting Height / Turning Radius / Aisle Width / Travel Speed / Battery Life / Navigation / Safety Obstacle Avoidance;底部页码"03"右对齐。
[规格] A4竖版,4K,避免表格字过小、颜色杂乱。
[Product副图] 展示无人机飞控电调产品性能亮点卖点图。 [氛围风格] 专业科技电商风,符合亚马逊平台审美,简洁功能化客观中立。 [画质] 商业摄影质感,产品清晰真实,画面干净高级,超高清分辨率。 [元素] 保持飞控电调产品外观(物理结构、材质质感、颜色)与输入产品图绝对一致,杜绝任何变形和色差,精细化处理。产品主体放置在画面左侧,占比约50%。右侧排版三个核心卖点文案,每个卖点配图标点缀。背景干净简洁深色科技渐变,突出产品和参数信息。商品主体完整清晰,无遮挡。 [光影] 主光正面打亮产品轮廓,高光突出PCB板和电子元件质感,辅光弱化阴影,整体对比清晰,科技感冷调光影。 [配色] 主色调深灰黑科技背景,金色点缀参数文字,对比清晰易读,符合电子产品视觉风格。 [视角构图] 平视视角,产品左文右图经典电商构图,主体突出,信息层级清晰。 [文字版式] 右侧竖排排列三个卖点,保持用户提供的英文文案: 1. Wide Voltage Range for Flexible Use • Supports 2S-12S input • Stable for all flight scenarios 2. High Current Output for Powerful Performance • 50A Continuous / 60A Peak current • Strong power for fast flight 3. Durable Design for Long-Term Use • Only 42g net weight lightweight • 30.5×30.5mm standard mounting 主标题加粗最大号白色字体,卖点文字小号白色,项目符号小金色点缀,左对齐排版,文字与背景对比强烈清晰,全部使用英文字符。 [比例分辨率] 1:1比例,2k分辨率,文字清晰可辨。 [负向提示词] 变形,水印,文字错乱,产品图模糊,背景杂乱,中文文字,遮挡产品,装饰边框,营销信息,最高级词汇。[Product副图] 展示无人机飞控电调产品性能亮点卖点图。
[氛围风格] 专业科技电商风,符合亚马逊平台审美,简洁功能化客观中立。
[画质] 商业摄影质感,产品清晰真实,画面干净高级,超高清分辨率。
[元素] 保持飞控电调产品外观(物理结构、材质质感、颜色)与输入产品图绝对一致,杜绝任何变形和色差,精细化处理。产品主体放置在画面左侧,占比约50%。右侧排版三个核心卖点文案,每个卖点配图标点缀。背景干净简洁深色科技渐变,突出产品和参数信息。商品主体完整清晰,无遮挡。
[光影] 主光正面打亮产品轮廓,高光突出PCB板和电子元件质感,辅光弱化阴影,整体对比清晰,科技感冷调光影。
[配色] 主色调深灰黑科技背景,金色点缀参数文字,对比清晰易读,符合电子产品视觉风格。
[视角构图] 平视视角,产品左文右图经典电商构图,主体突出,信息层级清晰。
[文字版式] 右侧竖排排列三个卖点,保持用户提供的英文文案:
1. Wide Voltage Range for Flexible Use
• Supports 2S-12S input
• Stable for all flight scenarios

2. High Current Output for Powerful Performance
• 50A Continuous / 60A Peak current
• Strong power for fast flight

3. Durable Design for Long-Term Use
• Only 42g net weight lightweight
• 30.5×30.5mm standard mounting

主标题加粗最大号白色字体,卖点文字小号白色,项目符号小金色点缀,左对齐排版,文字与背景对比强烈清晰,全部使用英文字符。
[比例分辨率] 1:1比例,2k分辨率,文字清晰可辨。
[负向提示词] 变形,水印,文字错乱,产品图模糊,背景杂乱,中文文字,遮挡产品,装饰边框,营销信息,最高级词汇。
[商品] 使用【图1】黑色雪山森林剪影汽车贴纸;保留山峰轮廓、松树造型、黑白剪影配色、横向长条形状;贴纸图案完整。 [画面] 目标:规格参数+品质保障页,展示产品信息与售后承诺。构图:左右分栏,左侧产品展示+尺寸标注占50%,右侧参数信息卡+保障说明占50%;景别:左侧产品特写带尺寸线,右侧信息卡排版;阅读动线:从左产品到右参数。 [视觉] 套系策略:风格=跨境极简高级商业风;标题字=现代无衬线粗体(英文字体);正文字=简洁无衬线体;主色=炭黑色;背景延展=基于炭黑做深浅层级、深灰渐变和细腻哑光质感;强调色=深森林绿,仅用于图标和重点标签;标题色=纯白色;正文色=浅灰色;组件=尺寸标注线、参数信息卡、保障图标、分隔线;光影=均匀柔光,产品清晰。 [文字] 左侧:产品旁标注尺寸"Approx. 12\" x 3.5\" (30cm x 9cm)";右侧顶部标题"Specifications & Quality Promise";参数列表:"Material: Premium PVC Vinyl"、"Color: Black"、"Quantity: 1 Piece"、"Waterproof: Yes"、"UV Resistant: Yes"、"Removable: Yes, No Residue";底部保障区:3个图标+文字"Satisfaction Guaranteed"、"Fast Shipping"、"Friendly Customer Support";所有文字横向排版。 [规格] 图片比例61:25横版(亚马逊高级A+电脑端),4K分辨率,避免变形、错字、文字过小、贴纸图案改变、纯白底、中文文字、绝对化用语。[商品] 使用【图1】黑色雪山森林剪影汽车贴纸;保留山峰轮廓、松树造型、黑白剪影配色、横向长条形状;贴纸图案完整。
[画面] 目标:规格参数+品质保障页,展示产品信息与售后承诺。构图:左右分栏,左侧产品展示+尺寸标注占50%,右侧参数信息卡+保障说明占50%;景别:左侧产品特写带尺寸线,右侧信息卡排版;阅读动线:从左产品到右参数。
[视觉] 套系策略:风格=跨境极简高级商业风;标题字=现代无衬线粗体(英文字体);正文字=简洁无衬线体;主色=炭黑色;背景延展=基于炭黑做深浅层级、深灰渐变和细腻哑光质感;强调色=深森林绿,仅用于图标和重点标签;标题色=纯白色;正文色=浅灰色;组件=尺寸标注线、参数信息卡、保障图标、分隔线;光影=均匀柔光,产品清晰。
[文字] 左侧:产品旁标注尺寸"Approx. 12\" x 3.5\" (30cm x 9cm)";右侧顶部标题"Specifications & Quality Promise";参数列表:"Material: Premium PVC Vinyl"、"Color: Black"、"Quantity: 1 Piece"、"Waterproof: Yes"、"UV Resistant: Yes"、"Removable: Yes, No Residue";底部保障区:3个图标+文字"Satisfaction Guaranteed"、"Fast Shipping"、"Friendly Customer Support";所有文字横向排版。
[规格] 图片比例61:25横版(亚马逊高级A+电脑端),4K分辨率,避免变形、错字、文字过小、贴纸图案改变、纯白底、中文文字、绝对化用语。
「图片1」6张主图官方方案 图序 用途 核心内容 布局建议 提示词关键词 图1 主图 搜索列表 8节电池+3000mAh+8PCS+Type-C 如上 产品摄影,网格布局 图2 充电 Type-C充电 电池+充电线+手机图标+“2小时充满” 左产品右场景 充电场景、USB 数据线、手机图标 图3 兼容 适用设备 灯具/鼠标/手柄/玩具/相机图标 产品居中+设备环形 兼容设备、图标、圆形布局 图4 卖点 核心优势 1200次+1.5V恒压+无记忆+防漏液 四宫格图标 四大特点、网格图标、优势 图5 对比 与传统对比 USB可充电与一次性干电池 左绿右红对比表 对比图,绿色 vs 红色 图6 规格 参数表 电压/电量/充电时间/循环/重量/尺寸 参数表格 规格表,技术数据 各图详细提示词 图2 充电场景提示词:Close-up product photography showing a AAA rechargeable battery being charged via USB Type-C cable. The cable connects to a smartphone in the background. Clean white background with soft studio lighting. Include text "Type-C Fast Charge" and "2 Hours Full". Modern tech aesthetic. 800x800 pixels. 图3 兼容设备提示词: Product layout showing a AAA rechargeable battery in the center surrounded by compatible device icons: remote control, wireless mouse, game controller, toy car, camera flash. Clean white background. Modern flat design icons. Text "Wide Compatibility". 800x800 pixels, e-commerce style. 图4 核心卖点提示词: 复制 Four-panel infographic layout on white background showing: 1. "1200+ Cycles" with recycling icon 2. "Constant 1.5V" with voltage icon 3. "USB Rechargeable" with USB icon 4. "No Leakage" with shield icon Clean modern design, tech blue and green color scheme. 800x800 pixels, e-commerce explainer style. 图5 对比图提示词: 复制 Comparison chart layout split into two halves: Left side (green): "USB Rechargeable" - shows battery with USB port, "1200+ uses", "Cost: $0.003 per use", eco-friendly icon Right side (red): "Disposable Battery" - shows alkaline battery, , waste icon Clean white background, clear visual contrast. 800x800 pixels. 图6 规格表提示词: 复制 Technical specification table layout on white background: - Voltage: 1.5V Constant - Capacity: 3000mAh - Charging: USB Type-C, 2 Hours - Cycle Life: 1200+ Cycles - Weight: 17g per battery - Dimensions: AAA Standard (10.5×44.5mm) Clean modern typography, tech blue accent colors. 800x800 pixels, e-commerce spec sheet style.「图片1」6张主图官方方案 图序	用途	核心内容	布局建议	提示词关键词 图1 主图	搜索列表	8节电池+3000mAh+8PCS+Type-C	如上	产品摄影,网格布局 图2 充电	Type-C充电	电池+充电线+手机图标+“2小时充满”	左产品右场景	充电场景、USB 数据线、手机图标 图3 兼容	适用设备	灯具/鼠标/手柄/玩具/相机图标	产品居中+设备环形	兼容设备、图标、圆形布局 图4 卖点	核心优势	1200次+1.5V恒压+无记忆+防漏液	四宫格图标	四大特点、网格图标、优势 图5 对比	与传统对比	USB可充电与一次性干电池	左绿右红对比表	对比图,绿色 vs 红色 图6 规格	参数表	电压/电量/充电时间/循环/重量/尺寸	参数表格	规格表,技术数据 各图详细提示词 图2 充电场景提示词:Close-up product photography showing a AAA rechargeable battery  being charged via USB Type-C cable. The cable connects to a  smartphone in the background. Clean white background with soft  studio lighting. Include text "Type-C Fast Charge" and  "2 Hours Full". Modern tech aesthetic. 800x800 pixels. 图3 兼容设备提示词:  Product layout showing a AAA rechargeable battery in the center  surrounded by compatible device icons: remote control, wireless  mouse, game controller, toy car, camera flash. Clean white  background. Modern flat design icons. Text "Wide Compatibility".  800x800 pixels, e-commerce style. 图4 核心卖点提示词:  复制 Four-panel infographic layout on white background showing: 1. "1200+ Cycles" with recycling icon 2. "Constant 1.5V" with voltage icon   3. "USB Rechargeable" with USB icon 4. "No Leakage" with shield icon Clean modern design, tech blue and green color scheme.  800x800 pixels, e-commerce explainer style. 图5 对比图提示词:  复制 Comparison chart layout split into two halves: Left side (green): "USB Rechargeable" - shows battery with USB  port, "1200+ uses", "Cost: $0.003 per use", eco-friendly icon Right side (red): "Disposable Battery" - shows alkaline battery, , waste icon Clean white background, clear visual contrast. 800x800 pixels. 图6 规格表提示词:  复制 Technical specification table layout on white background: - Voltage: 1.5V Constant - Capacity: 3000mAh - Charging: USB Type-C, 2 Hours - Cycle Life: 1200+ Cycles - Weight: 17g per battery - Dimensions: AAA Standard (10.5×44.5mm) Clean modern typography, tech blue accent colors.  800x800 pixels, e-commerce spec sheet style.
Translate the entire reference image into English while keeping exactly the same layout, style, and color scheme. Industrial serial port HMI screen, 800x480 landscape, light blue-gray background RGB(202,214,240), dark gray text and borders. Top title bar: left '★ Advanced Settings', right '[Back]' button with rounded border. First info row: 'Total Sections:' 'Section Name: Transition' 'Section No.:' 'Wefts:'. Row 2: '[Transition] Gradient Curve:' with three hollow radio circles ○ Linear ○ S-Curve ○ Exponential, right side '← Controls wide-to-narrow transition shape'. Row 3: '[Narrow] Ripple Mode:' with three hollow radio circles ○ Flat ○ Sawtooth ○ Sine Wave, right side '← Controls pattern on narrow segments'. Row 4: 'Ripple Amplitude: [ ] mm Period: [ ] wefts' with right note '← Pattern size and density'. Row 5: 'Envelope Control: ○ Enable Step: [ ] mm/cycle' with right note '← Pattern amplitude increases/decreases per cycle'. Row 6: 'Envelope Range: [ ] —— [ ] mm' with right note '← Min and max envelope amplitude'. Row 7: 'Wide Offset: [ ] mm Narrow Offset: [ ] mm' with right note '← Adjust base position of wide and narrow segments'. Row 8: 'Section Transition: ○ Hard Switch ○ Smooth Wefts: [ ]' with right note '← Transition mode and length between sections'. Bottom row: 4 dark gray rounded buttons with white text: [Apply] [Reset] [Save to USB] [Load from USB]. All text in English, all radio circles hollow, all input boxes empty, exact same layout and style as reference image.Translate the entire reference image into English while keeping exactly the same layout, style, and color scheme. Industrial serial port HMI screen, 800x480 landscape, light blue-gray background RGB(202,214,240), dark gray text and borders. Top title bar: left '★ Advanced Settings', right '[Back]' button with rounded border. First info row: 'Total Sections:'  'Section Name: Transition'  'Section No.:'  'Wefts:'. Row 2: '[Transition] Gradient Curve:' with three hollow radio circles ○ Linear ○ S-Curve ○ Exponential, right side '← Controls wide-to-narrow transition shape'. Row 3: '[Narrow] Ripple Mode:' with three hollow radio circles ○ Flat ○ Sawtooth ○ Sine Wave, right side '← Controls pattern on narrow segments'. Row 4: 'Ripple Amplitude: [  ] mm    Period: [  ] wefts' with right note '← Pattern size and density'. Row 5: 'Envelope Control: ○ Enable    Step: [  ] mm/cycle' with right note '← Pattern amplitude increases/decreases per cycle'. Row 6: 'Envelope Range: [  ] —— [  ] mm' with right note '← Min and max envelope amplitude'. Row 7: 'Wide Offset: [  ] mm    Narrow Offset: [  ] mm' with right note '← Adjust base position of wide and narrow segments'. Row 8: 'Section Transition: ○ Hard Switch ○ Smooth    Wefts: [  ]' with right note '← Transition mode and length between sections'. Bottom row: 4 dark gray rounded buttons with white text: [Apply] [Reset] [Save to USB] [Load from USB]. All text in English, all radio circles hollow, all input boxes empty, exact same layout and style as reference image.
Translate the entire reference image into English while keeping exactly the same layout, style, and color scheme. Industrial serial port HMI screen, 800x480 landscape, light blue-gray background RGB(202,214,240), dark gray text and borders. Top title bar: left '★ Advanced Settings', right '[Back]' button with rounded border. First info row: 'Total Sections:' 'Section Name: Transition' 'Section No.:' 'Wefts:'. Row 2: '[Transition] Gradient Curve:' with three hollow radio circles ○ Linear ○ S-Curve ○ Exponential, right side '← Controls wide-to-narrow transition shape'. Row 3: '[Narrow] Ripple Mode:' with three hollow radio circles ○ Flat ○ Sawtooth ○ Sine Wave, right side '← Controls pattern on narrow segments'. Row 4: 'Ripple Amplitude: [ ] mm Period: [ ] wefts' with right note '← Pattern size and density'. Row 5: 'Envelope Control: ○ Enable Step: [ ] mm/cycle' with right note '← Pattern amplitude increases/decreases per cycle'. Row 6: 'Envelope Range: [ ] —— [ ] mm' with right note '← Min and max envelope amplitude'. Row 7: 'Wide Offset: [ ] mm Narrow Offset: [ ] mm' with right note '← Adjust base position of wide and narrow segments'. Row 8: 'Section Transition: ○ Hard Switch ○ Smooth Wefts: [ ]' with right note '← Transition mode and length between sections'. Bottom row: 4 dark gray rounded buttons with white text: [Apply] [Reset] [Save to USB] [Load from USB]. All text in English, all radio circles hollow, all input boxes empty, exact same layout and style as reference image.Translate the entire reference image into English while keeping exactly the same layout, style, and color scheme. Industrial serial port HMI screen, 800x480 landscape, light blue-gray background RGB(202,214,240), dark gray text and borders. Top title bar: left '★ Advanced Settings', right '[Back]' button with rounded border. First info row: 'Total Sections:'  'Section Name: Transition'  'Section No.:'  'Wefts:'. Row 2: '[Transition] Gradient Curve:' with three hollow radio circles ○ Linear ○ S-Curve ○ Exponential, right side '← Controls wide-to-narrow transition shape'. Row 3: '[Narrow] Ripple Mode:' with three hollow radio circles ○ Flat ○ Sawtooth ○ Sine Wave, right side '← Controls pattern on narrow segments'. Row 4: 'Ripple Amplitude: [  ] mm    Period: [  ] wefts' with right note '← Pattern size and density'. Row 5: 'Envelope Control: ○ Enable    Step: [  ] mm/cycle' with right note '← Pattern amplitude increases/decreases per cycle'. Row 6: 'Envelope Range: [  ] —— [  ] mm' with right note '← Min and max envelope amplitude'. Row 7: 'Wide Offset: [  ] mm    Narrow Offset: [  ] mm' with right note '← Adjust base position of wide and narrow segments'. Row 8: 'Section Transition: ○ Hard Switch ○ Smooth    Wefts: [  ]' with right note '← Transition mode and length between sections'. Bottom row: 4 dark gray rounded buttons with white text: [Apply] [Reset] [Save to USB] [Load from USB]. All text in English, all radio circles hollow, all input boxes empty, exact same layout and style as reference image.
「图片1」「图片1」「图片1」,生成详情页,商品名称为主标题:加厚牛筋塑料平底铲 一铲多用超耐用 副标题:全新原料一体成型|抗摔耐造|家用商用通用一铲多用 全场景适配, 板块标题:多功能小平铲 居家 / 商铺 / 养殖全能用 场景文案 一把铲子搞定各类物料,平底设计铲取干净不残留 ✅ 粮油干货:铲黄豆、玉米、大米、面粉、杂粮 ✅ 餐饮冰鲜:铲冰块、海鲜、干货零食、散装糖果 ✅ 养殖农用:铲饲料、沙土、粮食、化肥 ✅ 居家清洁:铲积雪、碎垃圾、猫砂、杂物,格尺寸对照 大小按需选 板块标题:3 种尺寸全覆盖 家用商用精准匹配 尺寸对照表 表格 规格 总长 铲口宽 铲深 单只重量 适用场景 小号 33.5cm 18.5cm 5.5cm 约 85.6g 家用舀粮、奶茶店铲冰、分装零食 中号 35cm 20cm 6.5cm 约 102g 超市散装、水产海鲜、宠物店猫砂 大号 43cm 26cm 9cm 约 234g 粮店收粮、养殖场饲料、大量冰块搬运 辅助文案:搭配矿泉水直观对比,大小一目了然,手柄统一 10cm 握持长度,握感舒适不硌手,硬核品质 用料看得见 板块标题:加厚牛筋全新料,拒绝回收脆料 一体成型工艺 无拼接无缝隙,整体韧性强,大力弯折不开裂、长期使用不变形,铲面光滑易冲洗,不藏粮渣污渍 加厚铲边铲尖 铲尖厚度 1.69mm,铲边加厚至 1.90mm,铲硬物、冰块、砂石不易磨损,耐摔抗冲击,落地磕碰不易崩口 环保食品级原料 全新原生塑料,无异味可接触食品,可循环反复使用,安全放心,商超粮油、餐饮门店均可合规使用,人性化细节设计 板块标题:贴心设计,收纳使用双省心 加长防滑手柄 10cm 加长握柄,单手双手都好抓,铲重物不打滑,久握不累 尾部悬挂孔 手柄末端预留挂孔,挂钩上墙收纳,不占台面空间,门店仓库整洁好整理 平底宽铲斗 平底贴合台面、粮袋底部,边角粮食、面粉能全部铲干净,不浪费物料 双色区分选择 纯白款:食品粮油专用,干净直观;大红款:工地、养殖、仓库区分物料,醒目耐脏,五大核心优势 ✅ 加厚牛筋材质|抗摔耐造,低温不脆 ✅ 一体无缝成型|防水易洗,不藏残渣 ✅ 多规格尺寸|家用商用全覆盖 ✅ 食品级全新料|无异味可接触食材 ✅ 带悬挂孔设计|收纳便捷不占地,通用短标语 加厚塑料平底铲 铲粮铲冰铲饲料 抗摔牛筋料 一把用好多年 大小号齐全 厂家批发价优适配亚马逊平台,单图比例为1:1,需求屏数为10张。「图片1」「图片1」「图片1」,生成详情页,商品名称为主标题:加厚牛筋塑料平底铲 一铲多用超耐用
副标题:全新原料一体成型|抗摔耐造|家用商用通用一铲多用 全场景适配,
板块标题:多功能小平铲 居家 / 商铺 / 养殖全能用
场景文案
一把铲子搞定各类物料,平底设计铲取干净不残留
✅ 粮油干货:铲黄豆、玉米、大米、面粉、杂粮
✅ 餐饮冰鲜:铲冰块、海鲜、干货零食、散装糖果
✅ 养殖农用:铲饲料、沙土、粮食、化肥
✅ 居家清洁:铲积雪、碎垃圾、猫砂、杂物,格尺寸对照 大小按需选
板块标题:3 种尺寸全覆盖 家用商用精准匹配
尺寸对照表
表格
规格	总长	铲口宽	铲深	单只重量	适用场景
小号	33.5cm	18.5cm	5.5cm	约 85.6g	家用舀粮、奶茶店铲冰、分装零食
中号	35cm	20cm	6.5cm	约 102g	超市散装、水产海鲜、宠物店猫砂
大号	43cm	26cm	9cm	约 234g	粮店收粮、养殖场饲料、大量冰块搬运
辅助文案:搭配矿泉水直观对比,大小一目了然,手柄统一 10cm 握持长度,握感舒适不硌手,硬核品质 用料看得见
板块标题:加厚牛筋全新料,拒绝回收脆料
一体成型工艺
无拼接无缝隙,整体韧性强,大力弯折不开裂、长期使用不变形,铲面光滑易冲洗,不藏粮渣污渍
加厚铲边铲尖
铲尖厚度 1.69mm,铲边加厚至 1.90mm,铲硬物、冰块、砂石不易磨损,耐摔抗冲击,落地磕碰不易崩口
环保食品级原料
全新原生塑料,无异味可接触食品,可循环反复使用,安全放心,商超粮油、餐饮门店均可合规使用,人性化细节设计
板块标题:贴心设计,收纳使用双省心
加长防滑手柄
10cm 加长握柄,单手双手都好抓,铲重物不打滑,久握不累
尾部悬挂孔
手柄末端预留挂孔,挂钩上墙收纳,不占台面空间,门店仓库整洁好整理
平底宽铲斗
平底贴合台面、粮袋底部,边角粮食、面粉能全部铲干净,不浪费物料
双色区分选择
纯白款:食品粮油专用,干净直观;大红款:工地、养殖、仓库区分物料,醒目耐脏,五大核心优势
✅ 加厚牛筋材质|抗摔耐造,低温不脆
✅ 一体无缝成型|防水易洗,不藏残渣
✅ 多规格尺寸|家用商用全覆盖
✅ 食品级全新料|无异味可接触食材
✅ 带悬挂孔设计|收纳便捷不占地,通用短标语
加厚塑料平底铲 铲粮铲冰铲饲料
抗摔牛筋料 一把用好多年
大小号齐全 厂家批发价优适配亚马逊平台,单图比例为1:1,需求屏数为10张。
「图片1」「图片1」「图片1」,生成详情页,商品名称为主标题:加厚牛筋塑料平底铲 一铲多用超耐用 副标题:全新原料一体成型|抗摔耐造|家用商用通用一铲多用 全场景适配, 板块标题:多功能小平铲 居家 / 商铺 / 养殖全能用 场景文案 一把铲子搞定各类物料,平底设计铲取干净不残留 ✅ 粮油干货:铲黄豆、玉米、大米、面粉、杂粮 ✅ 餐饮冰鲜:铲冰块、海鲜、干货零食、散装糖果 ✅ 养殖农用:铲饲料、沙土、粮食、化肥 ✅ 居家清洁:铲积雪、碎垃圾、猫砂、杂物,格尺寸对照 大小按需选 板块标题:3 种尺寸全覆盖 家用商用精准匹配 尺寸对照表 表格 规格 总长 铲口宽 铲深 单只重量 适用场景 小号 33.5cm 18.5cm 5.5cm 约 85.6g 家用舀粮、奶茶店铲冰、分装零食 中号 35cm 20cm 6.5cm 约 102g 超市散装、水产海鲜、宠物店猫砂 大号 43cm 26cm 9cm 约 234g 粮店收粮、养殖场饲料、大量冰块搬运 辅助文案:搭配矿泉水直观对比,大小一目了然,手柄统一 10cm 握持长度,握感舒适不硌手,硬核品质 用料看得见 板块标题:加厚牛筋全新料,拒绝回收脆料 一体成型工艺 无拼接无缝隙,整体韧性强,大力弯折不开裂、长期使用不变形,铲面光滑易冲洗,不藏粮渣污渍 加厚铲边铲尖 铲尖厚度 1.69mm,铲边加厚至 1.90mm,铲硬物、冰块、砂石不易磨损,耐摔抗冲击,落地磕碰不易崩口 环保食品级原料 全新原生塑料,无异味可接触食品,可循环反复使用,安全放心,商超粮油、餐饮门店均可合规使用,人性化细节设计 板块标题:贴心设计,收纳使用双省心 加长防滑手柄 10cm 加长握柄,单手双手都好抓,铲重物不打滑,久握不累 尾部悬挂孔 手柄末端预留挂孔,挂钩上墙收纳,不占台面空间,门店仓库整洁好整理 平底宽铲斗 平底贴合台面、粮袋底部,边角粮食、面粉能全部铲干净,不浪费物料 双色区分选择 纯白款:食品粮油专用,干净直观;大红款:工地、养殖、仓库区分物料,醒目耐脏,五大核心优势 ✅ 加厚牛筋材质|抗摔耐造,低温不脆 ✅ 一体无缝成型|防水易洗,不藏残渣 ✅ 多规格尺寸|家用商用全覆盖 ✅ 食品级全新料|无异味可接触食材 ✅ 带悬挂孔设计|收纳便捷不占地,通用短标语 加厚塑料平底铲 铲粮铲冰铲饲料 抗摔牛筋料 一把用好多年 大小号齐全 厂家批发价优适配亚马逊平台,单图比例为1:1,需求屏数为10张。「图片1」「图片1」「图片1」,生成详情页,商品名称为主标题:加厚牛筋塑料平底铲 一铲多用超耐用
副标题:全新原料一体成型|抗摔耐造|家用商用通用一铲多用 全场景适配,
板块标题:多功能小平铲 居家 / 商铺 / 养殖全能用
场景文案
一把铲子搞定各类物料,平底设计铲取干净不残留
✅ 粮油干货:铲黄豆、玉米、大米、面粉、杂粮
✅ 餐饮冰鲜:铲冰块、海鲜、干货零食、散装糖果
✅ 养殖农用:铲饲料、沙土、粮食、化肥
✅ 居家清洁:铲积雪、碎垃圾、猫砂、杂物,格尺寸对照 大小按需选
板块标题:3 种尺寸全覆盖 家用商用精准匹配
尺寸对照表
表格
规格	总长	铲口宽	铲深	单只重量	适用场景
小号	33.5cm	18.5cm	5.5cm	约 85.6g	家用舀粮、奶茶店铲冰、分装零食
中号	35cm	20cm	6.5cm	约 102g	超市散装、水产海鲜、宠物店猫砂
大号	43cm	26cm	9cm	约 234g	粮店收粮、养殖场饲料、大量冰块搬运
辅助文案:搭配矿泉水直观对比,大小一目了然,手柄统一 10cm 握持长度,握感舒适不硌手,硬核品质 用料看得见
板块标题:加厚牛筋全新料,拒绝回收脆料
一体成型工艺
无拼接无缝隙,整体韧性强,大力弯折不开裂、长期使用不变形,铲面光滑易冲洗,不藏粮渣污渍
加厚铲边铲尖
铲尖厚度 1.69mm,铲边加厚至 1.90mm,铲硬物、冰块、砂石不易磨损,耐摔抗冲击,落地磕碰不易崩口
环保食品级原料
全新原生塑料,无异味可接触食品,可循环反复使用,安全放心,商超粮油、餐饮门店均可合规使用,人性化细节设计
板块标题:贴心设计,收纳使用双省心
加长防滑手柄
10cm 加长握柄,单手双手都好抓,铲重物不打滑,久握不累
尾部悬挂孔
手柄末端预留挂孔,挂钩上墙收纳,不占台面空间,门店仓库整洁好整理
平底宽铲斗
平底贴合台面、粮袋底部,边角粮食、面粉能全部铲干净,不浪费物料
双色区分选择
纯白款:食品粮油专用,干净直观;大红款:工地、养殖、仓库区分物料,醒目耐脏,五大核心优势
✅ 加厚牛筋材质|抗摔耐造,低温不脆
✅ 一体无缝成型|防水易洗,不藏残渣
✅ 多规格尺寸|家用商用全覆盖
✅ 食品级全新料|无异味可接触食材
✅ 带悬挂孔设计|收纳便捷不占地,通用短标语
加厚塑料平底铲 铲粮铲冰铲饲料
抗摔牛筋料 一把用好多年
大小号齐全 厂家批发价优适配亚马逊平台,单图比例为1:1,需求屏数为10张。